Chelsea Intermediate School

Project Details

Client:Chelsea Intermediate School
Location:Frankfort, IL
Year Completed:2017
Category:Public Facility

Project Overview

A high wind event delaminated a large section of the school’s EPDM roof system, separating the roof membrane and insulation. This level of damage meant the Franklin School District had to consider a roof replacement for this area of the roof. Ridgeworth Roofing was the successful bidder on this project’s base bid and included various alternates for additional roof areas. The Ridgeworth team removed the damaged EPDM roof system and disposed of all debris. They then inspected and replaced all damaged or wet insulation and refastened as needed. The team installed a new Derbigum USA two-ply modified bitumen roof system and also replaced all roof-related architectural sheet metal, pipe and ductwork supports. The new roof carries a Derbigum 30-year labor and material warranty to ensure customer satisfaction for years to come.